已选(0)清除
条数/页: 排序方式:
|
| Beam Induced Power Deposition in CERN SPS Injection Kickers 会议论文 Brazil, 2021 作者: M.J. Barnes; O. Bjorkqvist 收藏  |  浏览/下载:18/0  |  提交时间:2022/01/18 |
| Inductive Adder Prototype for FCC-hh Injection Kicker System 会议论文 Brazil, 2021 作者: D. Woog, M.J. Barnes; T. Kramer 收藏  |  浏览/下载:2/0  |  提交时间:2022/01/18 |
| Studies for Mitigating Flashover of CERN-LHC Dilution Kicker Magnets 会议论文 Brazil, 2021 作者: A.M. Loebner, M.J. Barnes; W. Bartmann; C. Bracco; L. Ducimetière; V. Namora 收藏  |  浏览/下载:2/0  |  提交时间:2022/01/18 |
| Impedance and Thermal Studies of the LHC Injection Kicker Magnet Upgrade 会议论文 Brazil, 2021 作者: M.J. Barnes; O. Bjorkqvist; F. Motschmann 收藏  |  浏览/下载:2/0  |  提交时间:2022/01/18 |
| Electromagnetic Modelling of Kicker Magnets to Derive Equivalent Circuits 会议论文 Brazil, 2021 作者: M.J. Barnes; O. Bjorkqvist 收藏  |  浏览/下载:7/0  |  提交时间:2022/01/18 |
| Requirements for an Inductive Voltage Adder as Driver for a Kicker Magnet with Short Circuit Termination 会议论文 Brazil, 2021 作者: J. Ruf; M.J. Barnes; T. Kramer 收藏  |  浏览/下载:8/0  |  提交时间:2022/01/18 |
| New Spiral Beam Screen Design for the FCC-hh Injection Kicker Magnet 会议论文 Australia, 2019 作者: M.J. Barnes; A. Chmielinska 收藏  |  浏览/下载:12/0  |  提交时间:2019/08/06 |
| Beam-Based Measurements on Two ±12.5 kV Inductive Adders, together with Striplines, for CLIC Damping Ring Extraction Kickers 会议论文 Australia, 2019 作者: J. Holma; M.J. Barnes; M. Carlà; N. Catalán Lasheras; Y. Papaphilippou 收藏  |  浏览/下载:11/0  |  提交时间:2019/08/06 |
| Operational Experience of a Prototype LHC Injection Kicker Magnet with a Low SEY Coating and Redistributed Power Deposition 会议论文 Australia, 2019 作者: 收藏  |  浏览/下载:27/0  |  提交时间:2019/08/06 |
| Laboratory Measurements on Two ±12.5 kV Inductive Adders with ±0.02% Waveform Stability for CLIC Damping Ring Extraction Kickers 会议论文 Australia, 2019 作者: J. Holma; M.J. Barnes; A. Chmielinska 收藏  |  浏览/下载:16/0  |  提交时间:2019/08/06 |