CORC

浏览/检索结果: 共20条,第1-10条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Addition-curable silicone composition, optical device encapsulating material and optical device 专利
专利号: US20150344691A1, 申请日期: 2015-12-03, 公开日期: 2015-12-03
作者:  KIMURA, SHINJI
收藏  |  浏览/下载:10/0  |  提交时间:2019/12/30
Delay tolerant network data routing method based on activity regulation 专利
申请日期: 2015-01-01,
作者:  CHEN JUNNING;  TAN SHOUBIAO;  LI ZHENGPING;  WU XIULONG;  LIN ZHITING
收藏  |  浏览/下载:5/0  |  提交时间:2019/04/19
Electric power network maximum quantity regulating method, involves connecting electric power network terminal with single wave message network terminal, and connecting network communication wire with network adjacent part. 专利
申请日期: 2015-01-01, 公开日期: 2015-12-23
作者:  BA Y LV Q LI W WANG H WANG Y TAN C
收藏  |  浏览/下载:6/0  |  提交时间:2019/12/09
Large power grid available transmission capacity decomposition coordination calculating method, involves obtaining available transmission capacity result of large power grid based on network connection relation. 专利
申请日期: 2015-01-01, 公开日期: 2015-01-14
作者:  FANG Y LI W LIU S WANG H SHI S YANG
收藏  |  浏览/下载:10/0  |  提交时间:2019/12/09
Silicon-on-insulator platform for integration of tunable laser arrays 专利
专利号: WO2014101877A1, 申请日期: 2014-07-03, 公开日期: 2014-07-03
作者:  LEI, HONGBING;  SHEN, XIAO A.;  BAI, YUSHENG
收藏  |  浏览/下载:7/0  |  提交时间:2019/12/30
Silicon-on-insulator platform for integration of tunable laser arrays 专利
专利号: WO2014101877A1, 申请日期: 2014-07-03, 公开日期: 2014-07-03
作者:  LEI, HONGBING;  SHEN, XIAO A.;  BAI, YUSHENG
收藏  |  浏览/下载:9/0  |  提交时间:2019/12/30
Automatic power network soft partition condition clustering method, involves performing partition process under clustering condition, determining electric distance of minimum controlled node, and analyzing boundary condition of sub-zone. 专利
申请日期: 2014-01-01, 公开日期: 2014-06-25
作者:  SUN H JIN X LI J ZHANG Y CHEN X LI
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/11
Regional power grid IMLD water-pumping energy-accumulating power station short-term multi-group network load distribution method, involves calculating iteration time value, determining station number, and calculating load of power station. 专利
申请日期: 2014-01-01, 公开日期: 2014
作者:  LIU Y LU J CHENG C CHENG X WU X SHE
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/11
Wireless node network based signal collecting and monitoring system for use in coal bed gas production well, has electronic system connected with scene terminal sub-system and wireless backbone network sub-system. 专利
申请日期: 2014-01-01, 公开日期: 2014-03-26
作者:  HU X ZHAO M LI Y ZHAO W CHEN S PAN
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/11
Factory network coordination mode based automatic stair power generation controlling method, involves calculating time order change value of automatic gain control system, and sending load result to power plant. 专利
申请日期: 2013-01-01, 公开日期: 2013-04-24
作者:  DAI J LI Z ZHANG X HE G LIAO S LI S
收藏  |  浏览/下载:2/0  |  提交时间:2019/12/13


©版权所有 ©2017 CSpace - Powered by CSpace