CORC

浏览/检索结果: 共3条,第1-3条 帮助

限定条件        
已选(0)清除 条数/页:   排序方式:
Underground railway connecting bus line planning method, involves obtaining passenger characteristic matrix, searching target vehicle number seats, obtaining terminal point information, and obtaining list route as optimal operation line. 专利
申请日期: 2018-01-01, 公开日期: 2018-03-13
作者:  KONG X TIAN K LI M LIU X WAN L XIA
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Method for planning instantaneous cutting amount, involves establishing thin-wall curved instantaneous cutting amount calculation model, construction coordinate system, and planning instantaneous cutting amount according to Hooks law. 专利
申请日期: 2018-01-01, 公开日期: 2018-02-23
作者:  MA J LIU Z HE G SONG D HU G JIA Z
收藏  |  浏览/下载:2/0  |  提交时间:2019/12/02
Cascade hydraulic power plant group east-to-west dispatching market combined trading strategy optimizing method, involves performing non-linear planning process to solve power generation dispatching model in intra-provincial market. 专利
申请日期: 2018-01-01, 公开日期: 2018-05-11
作者:  CHENG C MIAO S SHEN J CAO R ZHANG C
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02


©版权所有 ©2017 CSpace - Powered by CSpace