Monitoring and numerical simulation of deep foundation pit of a subway station in Lanzhou | |
Ye, Shuai-Hua1,2,3; Ding, Sheng-Huan1,2; Gong, Xiao-Nan3; Gao, Sheng4; Chen, Chang-Liu5 | |
刊名 | Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering |
2018-05-01 | |
卷号 | 40页码:177-182 |
关键词 | Axial flow Deformation Excavation Foundations Geotechnical engineering Groundwater Monitoring Numerical models Railroads Subway stations Tubular steel structures Axial forces Deep foundation pit Finite element software Foundation pits Horizontal and vertical displacement Horizontal displacements Monitoring analysis Numericl simulation |
ISSN号 | 10004548 |
DOI | 10.11779/CJGE2018S1029 |
英文摘要 | Based on the foundation pit of a subway station in Lanzhou, the horizontal and vertical displacements of pile top, surface settlement, axial force of steel supports and groundwater level of foundation pit during construction are monitored, and the monitoring data are analyzed. The monitoring results show that the horizontal displacement of pile top gradually changes from small to large and the vertical one of pile top increases with the increase of excavation depth, and the axial force of steel supports in the excavation process tends to be stable. Finally, the finite element software is used to simulate the excavation of the foundation pit. The simulated and monitoring results are compared. The results show that the numerical simulations and the monitoring results basically have the same variation rules. It is proved that the combined structure of steel tube bored pile and support is safe and feasible, and it ensures and maintains the stability of the foundation pit. This study may provide effective and reliable reference for the construction of similar foundation pits. © 2018, Editorial Office of Chinese Journal of Geotechnical Engineering. All right reserved. |
语种 | 中文 |
出版者 | Chinese Society of Civil Engineering |
内容类型 | 期刊论文 |
源URL | [http://ir.lut.edu.cn/handle/2XXMBERH/114924] |
专题 | 土木工程学院 |
作者单位 | 1.Key Laboratory of Disaster Mitigation in Civil Engineering of Gansu Province, Lanzhou University of Technology, Lanzhou; 730050, China; 2.Western Center of Disaster Mitigation in Civil Engineering, Ministry of Education, Lanzhou University of Technology, Lanzhou; 730050, China; 3.Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou; 310058, China; 4.China Railway Frist Survey and Design Institute Group Co., Ltd., Xi'an; 710043, China; 5.China Mobile Group Gansu Co., Ltd., Lanzhou; 730030, China |
推荐引用方式 GB/T 7714 | Ye, Shuai-Hua,Ding, Sheng-Huan,Gong, Xiao-Nan,et al. Monitoring and numerical simulation of deep foundation pit of a subway station in Lanzhou[J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,2018,40:177-182. |
APA | Ye, Shuai-Hua,Ding, Sheng-Huan,Gong, Xiao-Nan,Gao, Sheng,&Chen, Chang-Liu.(2018).Monitoring and numerical simulation of deep foundation pit of a subway station in Lanzhou.Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,40,177-182. |
MLA | Ye, Shuai-Hua,et al."Monitoring and numerical simulation of deep foundation pit of a subway station in Lanzhou".Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering 40(2018):177-182. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论