In-situ soaking test on composite loess foundation with down-hole dynamic compaction (DDC)
Kong, Yang1,2; Ruan, Huaining1,2; Huang, Xuefeng3,4
刊名Tumu Gongcheng Xuebao/China Civil Engineering Journal
2017-11-01
卷号50期号:11页码:125-132
关键词Compaction Concretes Foundations Load testing Sediments Testing Characteristic point Collapsible loess Composite foundations Foundation treatment Ground improvement Settlement Surface settlements Water infiltration
ISSN号1000131X
英文摘要Due to the fact that less research is focused on the soaking load test in loess area, a 137-day large-scale in-situ soaking test on the composite foundation treated by the down-hole dynamic compaction (DDC) method was carried out in loess area with 36.5m collapsible thickness in Peace Town, Lanzhou City. Several essential testing stages, such as ground humidification on leveled foundation, foundation treatment by the DDC method under different working conditions and field soaking below the cap were carried out in the test. Given the constant pile length, the relation of average compacting coefficient λac and pile spacing L of points between three piles can be represented by the Holliday formula. The time-varying curve of total settlement of concrete tap shows a clear "stair" shape, and the sharply increasing state is related to several collapses of the loess around and under the pile caused by water infiltration. The time-varying curve of total settlement for the concrete tap can be divided into 4 parts, i.e., the rapidly increasing stage, the constant stage, the gradually increasing stage and the tending to steady stage. The inflection point of each stage can be regarded as the characteristic point of the vertical movement study of water. The difference of the growth curve of the settlement at each stage is related to the occurrence of the remnant collapsible settlement. The surface swell around the cap is more obvious than the surface settlement, so, the position and time of the sharply increasing of surface swell point can be used to study the lateral movement of water. The reasonable pile spacing of the DDC method and pile length are suggested as 1.1m and 20m, respectively. © 2017, Editorial Office of China Civil Engineering Journal. All right reserved.
语种中文
出版者Chinese Society of Civil Engineering
内容类型期刊论文
源URL[http://ir.lut.edu.cn/handle/2XXMBERH/114935]  
专题兰州理工大学
作者单位1.Jiangsu Research Center for Geotechnical Engineering Technology, Hohai University, Nanjing; 210098, China;
2.Key Laboratory of the Ministry of Education for Geomechanics and Embankment Engineering, Hohai University, Nanjing; 210098, China;
3.Lanzhou University of Technology, Lanzhou; 730050, China;
4.Logistical Engineering University of PLA, Chongqing; 401331, China
推荐引用方式
GB/T 7714
Kong, Yang,Ruan, Huaining,Huang, Xuefeng. In-situ soaking test on composite loess foundation with down-hole dynamic compaction (DDC)[J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal,2017,50(11):125-132.
APA Kong, Yang,Ruan, Huaining,&Huang, Xuefeng.(2017).In-situ soaking test on composite loess foundation with down-hole dynamic compaction (DDC).Tumu Gongcheng Xuebao/China Civil Engineering Journal,50(11),125-132.
MLA Kong, Yang,et al."In-situ soaking test on composite loess foundation with down-hole dynamic compaction (DDC)".Tumu Gongcheng Xuebao/China Civil Engineering Journal 50.11(2017):125-132.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace