Reclamation and reuse of abandoned quarry: A case study of Ice World & Water Park in Changsha | |
Tan, Fei; Jiao, Yu-Yong; Wang, Hao; Liu, Yi; Tian, Hu-nan; Cheng, Yi | |
刊名 | TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
![]() |
2019 | |
卷号 | 85期号:-页码:259-267 |
关键词 | Abandoned quarry Ecological restoration Sustainable development Green construction |
ISSN号 | 0886-7798 |
DOI | 10.1016/j.tust.2018.12.009 |
英文摘要 | Comprehensive utilization of abandoned mine has become a hot issue in the recycling of world resources. The Dawangshan Pit in Changsha, China is an abandoned limestone quarry operated for over 40 years. This pit has always been a potential risk to the urban environment and ecological safety as it covers a large area and stores much water near downtown. The Changsha government has been recovering the landscape around the pit since 2014, and finally the project to construct a huge recreational building (the Ice World & Water Park, IWWP) in the pit was determined. This project faces three big challenges: unstable walls of the pit due to the poor geological conditions; huge size of the pit and the structures of the IWWP; and a fragile geological unit as basement. Settlements of these three challenges have been introduced one by one in this paper. This project benefits the Changsha city with a full utilization of land resource and improvement of the quality of land surrounding the quarry. Meanwhile, the recreational building will become a new landmark of Changsha. |
WOS研究方向 | Construction & Building Technology ; Engineering |
语种 | 英语 |
WOS记录号 | WOS:000457512000025 |
内容类型 | 期刊论文 |
源URL | [http://119.78.100.198/handle/2S6PX9GI/15041] ![]() |
专题 | 岩土力学所知识全产出_期刊论文 |
作者单位 | 1.China Univ Geosci, Fac Engn, Wuhan, Hubei, Peoples R China; 2.Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan, Hubei, Peoples R China; 3.Hunan Xiangjiang New Area Investment Grp Co Ltd, Changsha, Hunan, Peoples R China |
推荐引用方式 GB/T 7714 | Tan, Fei,Jiao, Yu-Yong,Wang, Hao,et al. Reclamation and reuse of abandoned quarry: A case study of Ice World & Water Park in Changsha[J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,2019,85(-):259-267. |
APA | Tan, Fei,Jiao, Yu-Yong,Wang, Hao,Liu, Yi,Tian, Hu-nan,&Cheng, Yi.(2019).Reclamation and reuse of abandoned quarry: A case study of Ice World & Water Park in Changsha.TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,85(-),259-267. |
MLA | Tan, Fei,et al."Reclamation and reuse of abandoned quarry: A case study of Ice World & Water Park in Changsha".TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY 85.-(2019):259-267. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论