Flexible Assembly Job-Shop Scheduling With Sequence-Dependent Setup Times and Part Sharing in a Dynamic Environment: Constraint Programming Model, Mixed-Integer Programming Model, and Dispatching Rules
Zhang, Sicheng1; Wang, Shouyang2
刊名IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT
2018-08-01
卷号65期号:3页码:487-504
关键词Assembly job-shop scheduling constraint programming (CP) dynamic scheduling flexible job-shop scheduling mixed-integer linear programming (MILP)
ISSN号0018-9391
DOI10.1109/TEM.2017.2785774
英文摘要This paper studies the flexible assembly job-shop scheduling problem in a dynamic manufacturing environment, which is an exension of job-shop scheduling with incorporation of serveral types of flexibilies and integration of an assembly stage. Each product is assembled from several parts with nonlinear process plans with operations involving alternative machines. Setup times are sequence dependent and serparately considered from processing times. Part sharing is fully allowed such that they can he used for the assembly of any passible product, rather than being preassociated to a specfic product. We employ constraint programming and mixed-integer linear programming to formulate the problem. Besides, several dispatching rules with machine feedback machanism are developped. Experimental studies are conducted based on test case problems with different scales and complexities. It is found that constraint programming is the most efficacious approach, whose solution fitness outperforms mixed-integer linear programming as well as all dispatching rules in both static and dynamic cases. On the other hand, dispatching rules are simple to implement, among which the "earliest completion time" rule is the most favourable. A real-time scheduling/rescheduling system has been constructed for the implementation of the proposed approaches to solve practical problems in production.
WOS研究方向Business & Economics ; Engineering
语种英语
出版者IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
WOS记录号WOS:000439383600012
内容类型期刊论文
源URL[http://ir.amss.ac.cn/handle/2S8OKBNM/33435]  
专题系统科学研究所
通讯作者Zhang, Sicheng
作者单位1.Chinese Acad Sci, Acad Math & Syst Sci, Beijing 100190, Peoples R China
2.Chinese Acad Sci, Acad Math & Syst Sci, Inst Syst Sci, Beijing, Peoples R China
推荐引用方式
GB/T 7714
Zhang, Sicheng,Wang, Shouyang. Flexible Assembly Job-Shop Scheduling With Sequence-Dependent Setup Times and Part Sharing in a Dynamic Environment: Constraint Programming Model, Mixed-Integer Programming Model, and Dispatching Rules[J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT,2018,65(3):487-504.
APA Zhang, Sicheng,&Wang, Shouyang.(2018).Flexible Assembly Job-Shop Scheduling With Sequence-Dependent Setup Times and Part Sharing in a Dynamic Environment: Constraint Programming Model, Mixed-Integer Programming Model, and Dispatching Rules.IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT,65(3),487-504.
MLA Zhang, Sicheng,et al."Flexible Assembly Job-Shop Scheduling With Sequence-Dependent Setup Times and Part Sharing in a Dynamic Environment: Constraint Programming Model, Mixed-Integer Programming Model, and Dispatching Rules".IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT 65.3(2018):487-504.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace