A multiobjective optimization method considering process risk correlation for project risk response planningSCI原文链接 | |
Wu, Dengsheng[1,2]; Li, Jianping[2,3]; Xia, Tongshui[1]; Bao, Chunbing[2,3]; Zhao, Yang[2,3]; Dai, Qianzhi[4] | |
2018 | |
卷号 | 467页码:282-295 |
URL标识 | 查看原文 |
WOS记录号 | WOS:000446291700018 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/6437598 |
专题 | 山东师范大学 |
作者单位 | 1.[1]Shandong Normal Univ, Business Sch, Jinan 250014, Shandong, Peoples R China 2.[2]Chinese Acad Sci, Inst Sci & Dev, Beijing 100190, Peoples R China 3.[3]Univ Chinese Acad Sci, Sch Publ Policy & Management, Beijing 100190, Peoples R China 4.[4]Hefei Univ Technol, Sch Econ, Hefei 230009, Anhui, Peoples R China |
推荐引用方式 GB/T 7714 | Wu, Dengsheng[1,2],Li, Jianping[2,3],Xia, Tongshui[1],等. A multiobjective optimization method considering process risk correlation for project risk response planningSCI原文链接[J],2018,467:282-295. |
APA | Wu, Dengsheng[1,2],Li, Jianping[2,3],Xia, Tongshui[1],Bao, Chunbing[2,3],Zhao, Yang[2,3],&Dai, Qianzhi[4].(2018).A multiobjective optimization method considering process risk correlation for project risk response planningSCI原文链接.,467,282-295. |
MLA | Wu, Dengsheng[1,2],et al."A multiobjective optimization method considering process risk correlation for project risk response planningSCI原文链接".467(2018):282-295. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论