CORC  > 北京航空航天大学
Multi-Agent Based Hyper-Heuristics for Multi-Objective Flexible Job Shop Scheduling: A Case Study in an Aero-Engine Blade Manufacturing Plant
Zhou, Yong; Yang, Jian-Jun; Zheng, Lian-Yu
刊名IEEE ACCESS
2019
卷号7页码:21147-21176
关键词Scheduling flexible job shop multi-agent hyper-heuristics genetic programming
ISSN号2169-3536
DOI10.1109/ACCESS.2019.2897603
URL标识查看原文
收录类别SCIE ; EI
WOS记录号WOS:000460519800001
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5921482
专题北京航空航天大学
推荐引用方式
GB/T 7714
Zhou, Yong,Yang, Jian-Jun,Zheng, Lian-Yu. Multi-Agent Based Hyper-Heuristics for Multi-Objective Flexible Job Shop Scheduling: A Case Study in an Aero-Engine Blade Manufacturing Plant[J]. IEEE ACCESS,2019,7:21147-21176.
APA Zhou, Yong,Yang, Jian-Jun,&Zheng, Lian-Yu.(2019).Multi-Agent Based Hyper-Heuristics for Multi-Objective Flexible Job Shop Scheduling: A Case Study in an Aero-Engine Blade Manufacturing Plant.IEEE ACCESS,7,21147-21176.
MLA Zhou, Yong,et al."Multi-Agent Based Hyper-Heuristics for Multi-Objective Flexible Job Shop Scheduling: A Case Study in an Aero-Engine Blade Manufacturing Plant".IEEE ACCESS 7(2019):21147-21176.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace