CORC  > 北京航空航天大学
Development cost prediction of general aviation aircraft projects with parametric modeling
Chen, Xiaonan; Huang, Jun; Yi, Mingxu
刊名CHINESE JOURNAL OF AERONAUTICS
2019
卷号32页码:1465-1471
关键词BP neural network Development cost General aviation aircraft Gray correlation analysis Linear regression P value analysis Parametric modeling Preliminary prediction Sensitivity analysis
ISSN号1000-9361
DOI10.1016/j.cja.2019.03.024
URL标识查看原文
收录类别SCIE ; EI
WOS记录号WOS:000473278800010
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5918540
专题北京航空航天大学
推荐引用方式
GB/T 7714
Chen, Xiaonan,Huang, Jun,Yi, Mingxu. Development cost prediction of general aviation aircraft projects with parametric modeling[J]. CHINESE JOURNAL OF AERONAUTICS,2019,32:1465-1471.
APA Chen, Xiaonan,Huang, Jun,&Yi, Mingxu.(2019).Development cost prediction of general aviation aircraft projects with parametric modeling.CHINESE JOURNAL OF AERONAUTICS,32,1465-1471.
MLA Chen, Xiaonan,et al."Development cost prediction of general aviation aircraft projects with parametric modeling".CHINESE JOURNAL OF AERONAUTICS 32(2019):1465-1471.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace