Makespan minimization for two parallel machines scheduling with a periodic availability constraint | |
Xu, Dehua; Cheng, Zhenmin; Yin, Yunqiang; Li, Hongxing | |
刊名 | COMPUTERS & OPERATIONS RESEARCH
![]() |
2009 | |
卷号 | 36页码:1809-1812 |
关键词 | Scheduling Parallel machine Availability Heuristic algorithm |
ISSN号 | 0305-0548 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/5309290 |
专题 | 大连理工大学 |
作者单位 | 1.Beijing Normal Univ, Sch Math Sci, Beijing 100875, Peoples R China. 2.Dalian Univ Technol, Sch Elect & Informat Engn, Dalian 116024, Peoples R China. |
推荐引用方式 GB/T 7714 | Xu, Dehua,Cheng, Zhenmin,Yin, Yunqiang,et al. Makespan minimization for two parallel machines scheduling with a periodic availability constraint[J]. COMPUTERS & OPERATIONS RESEARCH,2009,36:1809-1812. |
APA | Xu, Dehua,Cheng, Zhenmin,Yin, Yunqiang,&Li, Hongxing.(2009).Makespan minimization for two parallel machines scheduling with a periodic availability constraint.COMPUTERS & OPERATIONS RESEARCH,36,1809-1812. |
MLA | Xu, Dehua,et al."Makespan minimization for two parallel machines scheduling with a periodic availability constraint".COMPUTERS & OPERATIONS RESEARCH 36(2009):1809-1812. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论