CORC  > 西安交通大学
Unit constraints considered Genco's bidding strategies in hour-ahead electricity market
Wu, Jiang; Li, Chang-Shan; Guan, Xiao-Hong; Gao, Feng
刊名Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering
2008
卷号28期号:16页码:72-78
关键词Bidding strategy Iterative learning process Numerical testing Optimal bidding strategy Power generation company Q-learning Start-up costs Unit operating constraints
ISSN号0258-8013
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4848623
专题西安交通大学
推荐引用方式
GB/T 7714
Wu, Jiang,Li, Chang-Shan,Guan, Xiao-Hong,et al. Unit constraints considered Genco's bidding strategies in hour-ahead electricity market[J]. Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,2008,28(16):72-78.
APA Wu, Jiang,Li, Chang-Shan,Guan, Xiao-Hong,&Gao, Feng.(2008).Unit constraints considered Genco's bidding strategies in hour-ahead electricity market.Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,28(16),72-78.
MLA Wu, Jiang,et al."Unit constraints considered Genco's bidding strategies in hour-ahead electricity market".Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering 28.16(2008):72-78.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace