Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China | |
Lei Chen; Huitao Wang; Xinji Xu; Qingsong Zhang; Ningbo Li; Lingli Zhang | |
刊名 | Geotechnical and Geological Engineering |
2019 | |
卷号 | Vol.37 No.1页码:267-281 |
关键词 | Tunnel Grouting test Seismic ahead prospecting Velocity analysis Migration result Case study |
ISSN号 | 0960-3182;1573-1529 |
URL标识 | 查看原文 |
公开日期 | [db:dc_date_available] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4606610 |
专题 | 湖南大学 |
作者单位 | 1.Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,China 2.Water Recourses and Hydropower Planning and Design General Institute,Beijing,China |
推荐引用方式 GB/T 7714 | Lei Chen,Huitao Wang,Xinji Xu,et al. Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China[J]. Geotechnical and Geological Engineering,2019,Vol.37 No.1:267-281. |
APA | Lei Chen,Huitao Wang,Xinji Xu,Qingsong Zhang,Ningbo Li,&Lingli Zhang.(2019).Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China.Geotechnical and Geological Engineering,Vol.37 No.1,267-281. |
MLA | Lei Chen,et al."Advance Grouting Test Using Seismic Prospecting Method in TBM Tunneling: A Case Study in the Water Supply Project from Songhua River, Jilin, China".Geotechnical and Geological Engineering Vol.37 No.1(2019):267-281. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论