Real time complex lower limit cascade hydraulic power plant group optimizing adjusting method, involves defining power generation schedule and power grid electric power balance constraint for hydroelectric power station. | |
CHENG C LIAO S LI G WU X SHEN J WAN | |
2014 | |
公开日期 | 2014-11-26 |
URL标识 | 查看原文 |
申请日期 | 2014-08-21 |
内容类型 | 专利 |
URI标识 | http://www.corc.org.cn/handle/1471x/4516701 |
专题 | 大连理工大学 |
作者单位 | UNIV DALIAN TECHNOLOGY (UYDA-C |
推荐引用方式 GB/T 7714 | CHENG C LIAO S LI G WU X SHEN J WAN. Real time complex lower limit cascade hydraulic power plant group optimizing adjusting method, involves defining power generation schedule and power grid electric power balance constraint for hydroelectric power station.. 2014-01-01. |