Real time complex lower limit cascade hydraulic power plant group optimizing adjusting method, involves defining power generation schedule and power grid electric power balance constraint for hydroelectric power station.
CHENG C LIAO S LI G WU X SHEN J WAN
2014
公开日期2014-11-26
URL标识查看原文
申请日期2014-08-21
内容类型专利
URI标识http://www.corc.org.cn/handle/1471x/4516701
专题大连理工大学
作者单位UNIV DALIAN TECHNOLOGY (UYDA-C
推荐引用方式
GB/T 7714
CHENG C LIAO S LI G WU X SHEN J WAN. Real time complex lower limit cascade hydraulic power plant group optimizing adjusting method, involves defining power generation schedule and power grid electric power balance constraint for hydroelectric power station.. 2014-01-01.