Sludge production and management processes: case study in China | |
Lee D. J. ; Spinosa L. ; He P. J. ; Chen T. B. | |
2006 | |
关键词 | performance risk sewage sludge treatment plan |
英文摘要 | In 2010, the sewage sludge production rate will be 178,500 t dried solids (ds) for Beijing and. 294,000 t-ds for Shanghai, respectively. Beijing adopts a centralized system to stabilize 78% of her sludge, in three rural Stabilization Centres. Aerated composting technique will be used. Shanghai on the contrary decentralizes the management plan to treat the sludge on site. Diverse treatment trains, such as aerobic/anaerobic digestion, drying, incineration, and composting will be applied. Production rate, treatment plan, and the associated costs, energy consumption, carbon dioxide emission, and risk assessment for heavy metals and pathogens on human health were evaluated in this report for sludges yielded in Beijing and Shanghai, China. |
出处 | Water Science and Technology |
卷 | 54 |
期 | 5 |
页 | 189-196 |
收录类别 | SCI |
语种 | 英语 |
ISSN号 | 0273-1223 |
内容类型 | SCI/SSCI论文 |
源URL | [http://ir.igsnrr.ac.cn/handle/311030/23697] |
专题 | 地理科学与资源研究所_历年回溯文献 |
推荐引用方式 GB/T 7714 | Lee D. J.,Spinosa L.,He P. J.,et al. Sludge production and management processes: case study in China. 2006. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论