Dynamic three-dimension visual simulation for dam concrete construction process | |
Mei, Yadong; Dong, Yajie; Shen, Mingliang; Chen, Lihua | |
刊名 | CME 2007 Conference - Construction Management and Economics: 'Past, Present and Future' |
2007 | |
URL标识 | 查看原文 |
收录类别 | EI |
语种 | 英语 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3738665 |
专题 | 武汉大学 |
推荐引用方式 GB/T 7714 | Mei, Yadong,Dong, Yajie,Shen, Mingliang,et al. Dynamic three-dimension visual simulation for dam concrete construction process[J]. CME 2007 Conference - Construction Management and Economics: 'Past, Present and Future',2007. |
APA | Mei, Yadong,Dong, Yajie,Shen, Mingliang,&Chen, Lihua.(2007).Dynamic three-dimension visual simulation for dam concrete construction process.CME 2007 Conference - Construction Management and Economics: 'Past, Present and Future'. |
MLA | Mei, Yadong,et al."Dynamic three-dimension visual simulation for dam concrete construction process".CME 2007 Conference - Construction Management and Economics: 'Past, Present and Future' (2007). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论