CORC  > 武汉理工大学
Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption
Liu, Zhengchao; Guo, Shunsheng*; Wang, Lei
刊名JOURNAL OF CLEANER PRODUCTION
2019
卷号211页码:765-786
关键词Integrated green scheduling Comprehensive energy consumption Flexible job shop Crane transportation Green transport heuristic strategy
ISSN号0959-6526
DOI10.1016/j.jclepro.2018.11.231
URL标识查看原文
WOS记录号WOS:000457952400066
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3382090
专题武汉理工大学
作者单位1.[Guo, Shunsheng
2.Liu, Zhengchao
3.Wang, Lei] Wuhan Univ Technol, Sch Mech & Elect Engn, Wuhan 430070, Peoples R China.
推荐引用方式
GB/T 7714
Liu, Zhengchao,Guo, Shunsheng*,Wang, Lei. Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption[J]. JOURNAL OF CLEANER PRODUCTION,2019,211:765-786.
APA Liu, Zhengchao,Guo, Shunsheng*,&Wang, Lei.(2019).Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption.JOURNAL OF CLEANER PRODUCTION,211,765-786.
MLA Liu, Zhengchao,et al."Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption".JOURNAL OF CLEANER PRODUCTION 211(2019):765-786.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace