Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption | |
Liu, Zhengchao; Guo, Shunsheng*; Wang, Lei | |
刊名 | JOURNAL OF CLEANER PRODUCTION |
2019 | |
卷号 | 211页码:765-786 |
关键词 | Integrated green scheduling Comprehensive energy consumption Flexible job shop Crane transportation Green transport heuristic strategy |
ISSN号 | 0959-6526 |
DOI | 10.1016/j.jclepro.2018.11.231 |
URL标识 | 查看原文 |
WOS记录号 | WOS:000457952400066 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3382090 |
专题 | 武汉理工大学 |
作者单位 | 1.[Guo, Shunsheng 2.Liu, Zhengchao 3.Wang, Lei] Wuhan Univ Technol, Sch Mech & Elect Engn, Wuhan 430070, Peoples R China. |
推荐引用方式 GB/T 7714 | Liu, Zhengchao,Guo, Shunsheng*,Wang, Lei. Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption[J]. JOURNAL OF CLEANER PRODUCTION,2019,211:765-786. |
APA | Liu, Zhengchao,Guo, Shunsheng*,&Wang, Lei.(2019).Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption.JOURNAL OF CLEANER PRODUCTION,211,765-786. |
MLA | Liu, Zhengchao,et al."Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption".JOURNAL OF CLEANER PRODUCTION 211(2019):765-786. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论