CORC  > 西安交通大学
Minimizing the total completion time in a distributed two stage assembly system with setup times
Xiong, Fuli; Xing, Keyi; Wang, Feng; Lei, Hang; Han, Libin
刊名COMPUTERS & OPERATIONS RESEARCH
2014
卷号47期号:[db:dc_citation_issue]页码:92-105
关键词Scheduling Total completion time Hybrid meta-heuristics Distributed two-stage assembly flowshop
ISSN号0305-0548
DOI[db:dc_identifier_doi]
URL标识查看原文
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/3300918
专题西安交通大学
推荐引用方式
GB/T 7714
Xiong, Fuli,Xing, Keyi,Wang, Feng,et al. Minimizing the total completion time in a distributed two stage assembly system with setup times[J]. COMPUTERS & OPERATIONS RESEARCH,2014,47([db:dc_citation_issue]):92-105.
APA Xiong, Fuli,Xing, Keyi,Wang, Feng,Lei, Hang,&Han, Libin.(2014).Minimizing the total completion time in a distributed two stage assembly system with setup times.COMPUTERS & OPERATIONS RESEARCH,47([db:dc_citation_issue]),92-105.
MLA Xiong, Fuli,et al."Minimizing the total completion time in a distributed two stage assembly system with setup times".COMPUTERS & OPERATIONS RESEARCH 47.[db:dc_citation_issue](2014):92-105.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace