Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model | |
Liao, Shengli; Zhao, Hongye; Li, Gang; Liu, Benxi | |
刊名 | ENERGIES |
2019 | |
卷号 | 12 |
关键词 | hydropower plant with multiple turbines in one tunnel short-term load distribution unit commitment two-phase decomposition approach hydro-unit on-off optimal model |
ISSN号 | 1996-1073 |
URL标识 | 查看原文 |
WOS记录号 | [DB:DC_IDENTIFIER_WOSID] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3217268 |
专题 | 大连理工大学 |
作者单位 | Dalian Univ Technol, Inst Hydropower Syst & Hydroinformat, Dalian 116024, Peoples R China.,Dalian Univ Technol, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat, Dalian 116024, Peoples R China. |
推荐引用方式 GB/T 7714 | Liao, Shengli,Zhao, Hongye,Li, Gang,et al. Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model[J]. ENERGIES,2019,12. |
APA | Liao, Shengli,Zhao, Hongye,Li, Gang,&Liu, Benxi.(2019).Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model.ENERGIES,12. |
MLA | Liao, Shengli,et al."Short-Term Load Dispatching Method for a Diversion Hydropower Plant with Multiple Turbines in One Tunnel Using a Two-Stage Model".ENERGIES 12(2019). |