A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning | |
Fang, Chang[1,2]; Liu, Xinbao[4]; Pardalos, Panos M.[2]; Long, Jianyu[2,3]; Pei, Jun[2,4]; Zuo, Chao[5] | |
2017 | |
卷号 | 68页码:851-878 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3194572 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Fang, Chang[1,2],Liu, Xinbao[4],Pardalos, Panos M.[2],et al. A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning[J],2017,68:851-878. |
APA | Fang, Chang[1,2],Liu, Xinbao[4],Pardalos, Panos M.[2],Long, Jianyu[2,3],Pei, Jun[2,4],&Zuo, Chao[5].(2017).A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning.,68,851-878. |
MLA | Fang, Chang[1,2],et al."A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning".68(2017):851-878. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论