A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong | |
Li, Clyde Zhengdao[1]; Xu, Xiaoxiao[2]; Shen, Geoffrey Qiping[3]; Fan, Cheng[1]; Li, Xiao[3]; Hong, Jingke[4] | |
2018 | |
卷号 | 185页码:366-381 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/3178829 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Li, Clyde Zhengdao[1],Xu, Xiaoxiao[2],Shen, Geoffrey Qiping[3],et al. A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong[J],2018,185:366-381. |
APA | Li, Clyde Zhengdao[1],Xu, Xiaoxiao[2],Shen, Geoffrey Qiping[3],Fan, Cheng[1],Li, Xiao[3],&Hong, Jingke[4].(2018).A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong.,185,366-381. |
MLA | Li, Clyde Zhengdao[1],et al."A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong".185(2018):366-381. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论