Determination on the volume of project revenue bonds in PPP project: A case of Chongqing rail transit line 9 | |
Gu, Xiang[1]; Yan, Yan[1]; Deng, Ya-Lan[1]; Zhao, Peng[1] | |
2017 | |
卷号 | 20页码:1397-1400 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2981179 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Gu, Xiang[1],Yan, Yan[1],Deng, Ya-Lan[1],et al. Determination on the volume of project revenue bonds in PPP project: A case of Chongqing rail transit line 9[J],2017,20:1397-1400. |
APA | Gu, Xiang[1],Yan, Yan[1],Deng, Ya-Lan[1],&Zhao, Peng[1].(2017).Determination on the volume of project revenue bonds in PPP project: A case of Chongqing rail transit line 9.,20,1397-1400. |
MLA | Gu, Xiang[1],et al."Determination on the volume of project revenue bonds in PPP project: A case of Chongqing rail transit line 9".20(2017):1397-1400. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论