Overhead Line Preventive Maintenance Strategy Based on Condition Monitoring and System Reliability Assessment | |
Zhang, Dabo[1]; Li, Wenyuan[1,2,3]; Xiong, Xiaofu[1] | |
2014 | |
卷号 | 29页码:1839-1846 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2973102 |
专题 | 重庆大学 |
推荐引用方式 GB/T 7714 | Zhang, Dabo[1],Li, Wenyuan[1,2,3],Xiong, Xiaofu[1]. Overhead Line Preventive Maintenance Strategy Based on Condition Monitoring and System Reliability Assessment[J],2014,29:1839-1846. |
APA | Zhang, Dabo[1],Li, Wenyuan[1,2,3],&Xiong, Xiaofu[1].(2014).Overhead Line Preventive Maintenance Strategy Based on Condition Monitoring and System Reliability Assessment.,29,1839-1846. |
MLA | Zhang, Dabo[1],et al."Overhead Line Preventive Maintenance Strategy Based on Condition Monitoring and System Reliability Assessment".29(2014):1839-1846. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论