CORC  > 西安交通大学
Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints
Ding, Tao; Li, Cheng; Hu, Yuan; Bie, Zhaohong
刊名Dianwang Jishu/Power System Technology
2017
卷号41页码:3566-3572
关键词Decision tree modeling Multi-stage stochastic programming Nonanticipative constraint Power system planning Scenario tree
ISSN号1000-3673
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2947357
专题西安交通大学
推荐引用方式
GB/T 7714
Ding, Tao,Li, Cheng,Hu, Yuan,et al. Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints[J]. Dianwang Jishu/Power System Technology,2017,41:3566-3572.
APA Ding, Tao,Li, Cheng,Hu, Yuan,&Bie, Zhaohong.(2017).Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints.Dianwang Jishu/Power System Technology,41,3566-3572.
MLA Ding, Tao,et al."Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints".Dianwang Jishu/Power System Technology 41(2017):3566-3572.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace