Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints | |
Ding, Tao; Li, Cheng; Hu, Yuan; Bie, Zhaohong | |
刊名 | Dianwang Jishu/Power System Technology |
2017 | |
卷号 | 41页码:3566-3572 |
关键词 | Decision tree modeling Multi-stage stochastic programming Nonanticipative constraint Power system planning Scenario tree |
ISSN号 | 1000-3673 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2947357 |
专题 | 西安交通大学 |
推荐引用方式 GB/T 7714 | Ding, Tao,Li, Cheng,Hu, Yuan,et al. Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints[J]. Dianwang Jishu/Power System Technology,2017,41:3566-3572. |
APA | Ding, Tao,Li, Cheng,Hu, Yuan,&Bie, Zhaohong.(2017).Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints.Dianwang Jishu/Power System Technology,41,3566-3572. |
MLA | Ding, Tao,et al."Multi-Stage Stochastic Programming for Power System Planning Considering Nonanticipative Constraints".Dianwang Jishu/Power System Technology 41(2017):3566-3572. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论