FIRST BEAM ACCELERATION IN KOLKATA SUPERCONDUCTING CYCLOTRON AND ITS PRESENT STATUS
Chaturanan Mallik and Rakesh Kumar Bhandari (on behalf of VECC Staff)
2010-09-10
会议日期2010-09-06
会议地点兰州
英文摘要VECC, Kolkata were integrated by May 2009. After achieving the required vacuum and Dee voltage a series of internal beam trials were started. The beam was accelerated to full extraction radius on August 25th and beam confirmed by neutron measurements. The trials were not without difficulty and several problems did crop up during the initial phase. With minor modifications vacuum of the order of 10-7 mbar was obtained. Major problems encountered were related to obtaining sufficient Dee voltages primarily due to ceramic insulator cracking at moderate power levels leading to vacuum breakdown. Earlier the 14 GHz ECR ion source was connected with 23 metre injection line without much difficulty. An analogue beam was also accelerated before taking a shutdown for installation of extraction system and major augmentation of cryogenic plant. Presently extraction of the beam is being tried. It is planned to transport the beam to already installed first experimental station.
会议录The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'56
资助机构IMP;Chinese Academy of Sciences
语种英语
URL标识查看原文
内容类型会议论文
源URL[http://ir.imp.cas.cn/handle/113462/8611]  
专题近代物理研究所_近代物理研究所知识存储(2010之前)
推荐引用方式
GB/T 7714
Chaturanan Mallik and Rakesh Kumar Bhandari . FIRST BEAM ACCELERATION IN KOLKATA SUPERCONDUCTING CYCLOTRON AND ITS PRESENT STATUS[C]. 见:. 兰州. 2010-09-06.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace