CORC  > 上海大学
Two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage
He, Long-Min[1]; Sun, Shi-Jie[2]; Cheng, Ming-Bao[3]
刊名Journal of Harbin Institute of Technology (New Series)
2008
卷号15页码:674-678
ISSN号10059113
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/2344734
专题上海大学
作者单位[1]Dept. of Mathematics, Shanghai University, Shanghai 200444, China[2]Dept. of Mathematics, Shanghai University, Shanghai 200444, China[3]Dept. of Mathematics, Shanghai University, Shanghai 200444, China
推荐引用方式
GB/T 7714
He, Long-Min[1],Sun, Shi-Jie[2],Cheng, Ming-Bao[3]. Two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage[J]. Journal of Harbin Institute of Technology (New Series),2008,15:674-678.
APA He, Long-Min[1],Sun, Shi-Jie[2],&Cheng, Ming-Bao[3].(2008).Two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage.Journal of Harbin Institute of Technology (New Series),15,674-678.
MLA He, Long-Min[1],et al."Two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage".Journal of Harbin Institute of Technology (New Series) 15(2008):674-678.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace