Adaptive sequential importance sampling technique for short-term composite power system adequacy evaluation (EI收录) | |
Wang, Yue[1]; Guo, Chuangxin[1]; Wu, Qinghua[2,3]; Dong, Shufeng[1] | |
刊名 | IET Generation, Transmission and Distribution |
2014 | |
卷号 | 8页码:730-741 |
关键词 | Efficiency Importance sampling Repair Weibull distribution |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2217481 |
专题 | 华南理工大学 |
作者单位 | 1.[1] Department of Electrical Engineering, Zhejiang University, Hangzhou 310027, China 2.[2] School of Electric Power Engineering, South China University of Technology, Guangzhou 510641, China 3.[3] Department of Electrical Engineering and Electronics, The University of Liverpool, Liverpool L69 3GJ, United Kingdom |
推荐引用方式 GB/T 7714 | Wang, Yue[1],Guo, Chuangxin[1],Wu, Qinghua[2,3],等. Adaptive sequential importance sampling technique for short-term composite power system adequacy evaluation (EI收录)[J]. IET Generation, Transmission and Distribution,2014,8:730-741. |
APA | Wang, Yue[1],Guo, Chuangxin[1],Wu, Qinghua[2,3],&Dong, Shufeng[1].(2014).Adaptive sequential importance sampling technique for short-term composite power system adequacy evaluation (EI收录).IET Generation, Transmission and Distribution,8,730-741. |
MLA | Wang, Yue[1],et al."Adaptive sequential importance sampling technique for short-term composite power system adequacy evaluation (EI收录)".IET Generation, Transmission and Distribution 8(2014):730-741. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论