Excavation of Middle Huai-Hai Road Station of Shanghai Metro Line 13: Challenges, Risks, Countermeasures, and Performance Assessment | |
Tan, Yong[1]; Wang, Dalong[2]; Lu, Ye[3]; Fang, Tao[4] | |
刊名 | PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION |
2017 | |
卷号 | 22 |
关键词 | Subway station Excavation Superstructures Challenge Risk Countermeasure Design and construction Field monitoring Performance |
ISSN号 | 1084-0680 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2184264 |
专题 | 上海大学 |
作者单位 | 1.[1]Tongji Univ, Coll Civil Engn, Dept Geotech Engn, 1239 Siping Rd, Shanghai 200092, Peoples R China. 2.[2]Shanghai Geotech Invest & Design Inst Co Ltd, 681 Xiao Mu Qiao Rd, Shanghai 200032, Peoples R China. 3.[3]Shanghai Univ, Dept Civil Engn, 99 Shang Da Rd, Shanghai 200436, Peoples R China. 4.[4]East China Jiao Tong Univ, Sch Civil Engn & Architecture, 808 Shuang Gang East Ave, Nanchang 330013, Jiangxi, Peoples R China. |
推荐引用方式 GB/T 7714 | Tan, Yong[1],Wang, Dalong[2],Lu, Ye[3],et al. Excavation of Middle Huai-Hai Road Station of Shanghai Metro Line 13: Challenges, Risks, Countermeasures, and Performance Assessment[J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION,2017,22. |
APA | Tan, Yong[1],Wang, Dalong[2],Lu, Ye[3],&Fang, Tao[4].(2017).Excavation of Middle Huai-Hai Road Station of Shanghai Metro Line 13: Challenges, Risks, Countermeasures, and Performance Assessment.PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION,22. |
MLA | Tan, Yong[1],et al."Excavation of Middle Huai-Hai Road Station of Shanghai Metro Line 13: Challenges, Risks, Countermeasures, and Performance Assessment".PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION 22(2017). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论