Cranes scheduling in frame bridges based automated container terminals | |
Zhen, Lu[1]; Hu, Hongtao[2]; Wang, Wencheng[3]; Shi, Xin[4]; Ma, Chengle[5] | |
刊名 | TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES |
2018 | |
卷号 | 97页码:369-384 |
关键词 | Scheduling Port operation Automated container terminals Quay cranes |
ISSN号 | 0968-090X |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2167260 |
专题 | 上海大学 |
作者单位 | 1.[1]Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China. 2.[2]Shanghai Maritime Univ, Logist Engn Coll, Shanghai 201306, Peoples R China. 3.[3]Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China. 4.[4]Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China. 5.Manchester Metropolitan Univ, Business Sch, Manchester M15 6BH, Lancs, England.,Karaganda State Med Univ, Karaganda, Kazakhstan. 6.[5]Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China. |
推荐引用方式 GB/T 7714 | Zhen, Lu[1],Hu, Hongtao[2],Wang, Wencheng[3],et al. Cranes scheduling in frame bridges based automated container terminals[J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES,2018,97:369-384. |
APA | Zhen, Lu[1],Hu, Hongtao[2],Wang, Wencheng[3],Shi, Xin[4],&Ma, Chengle[5].(2018).Cranes scheduling in frame bridges based automated container terminals.TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES,97,369-384. |
MLA | Zhen, Lu[1],et al."Cranes scheduling in frame bridges based automated container terminals".TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES 97(2018):369-384. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论