A reliability-and-cost-based fuzzy approach to optimize preventive maintenance scheduling for offshore wind farms | |
Zhong, Shuya[1]; Pantelous, Athanasios A.[2]; Goh, Mark[3]; Zhou, Jian[4] | |
刊名 | MECHANICAL SYSTEMS AND SIGNAL PROCESSING |
2019 | |
卷号 | 124页码:643-663 |
关键词 | Offshore wind energy Preventive maintenance scheduling Fuzzy chance-constrained programming Fuzzy multi-objective programming Reliability Maintenance cost |
ISSN号 | 0888-3270 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/2163549 |
专题 | 上海大学 |
作者单位 | 1.[1]Univ Cambridge, Dept Engn, Inst Mfg, Cambridge CB3 0FS, England. 2.[2]Monash Univ, Dept Econometr & Business Stat, Clayton, Vic 3800, Australia. 3.[3]Natl Univ Singapore, Logist Inst Asia Pacific, Singapore 119613, Singapore.,Natl Univ Singapore, NUS Business Sch, Singapore 119613, Singapore. 4.[4]Shanghai Univ, Sch Management, Dept Management Sci & Engn, Shanghai 200444, Peoples R China. |
推荐引用方式 GB/T 7714 | Zhong, Shuya[1],Pantelous, Athanasios A.[2],Goh, Mark[3],et al. A reliability-and-cost-based fuzzy approach to optimize preventive maintenance scheduling for offshore wind farms[J]. MECHANICAL SYSTEMS AND SIGNAL PROCESSING,2019,124:643-663. |
APA | Zhong, Shuya[1],Pantelous, Athanasios A.[2],Goh, Mark[3],&Zhou, Jian[4].(2019).A reliability-and-cost-based fuzzy approach to optimize preventive maintenance scheduling for offshore wind farms.MECHANICAL SYSTEMS AND SIGNAL PROCESSING,124,643-663. |
MLA | Zhong, Shuya[1],et al."A reliability-and-cost-based fuzzy approach to optimize preventive maintenance scheduling for offshore wind farms".MECHANICAL SYSTEMS AND SIGNAL PROCESSING 124(2019):643-663. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论