Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China | |
Zhang, XS; Ma, GW; Huang, WB; Chen, SJ; Zhang, S | |
刊名 | Energies |
2018 | |
卷号 | Vol.11 No.4页码:868 |
关键词 | wind power photovoltaic power hydropower complementary operation scheduling progress optimality algorithm (POA) |
ISSN号 | 1996-1073 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/1842488 |
专题 | 四川大学 |
作者单位 | Sichuan Univ, Coll Water Resource & Hydropower, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Sichuan, Peoples R China |
推荐引用方式 GB/T 7714 | Zhang, XS,Ma, GW,Huang, WB,et al. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China[J]. Energies,2018,Vol.11 No.4:868. |
APA | Zhang, XS,Ma, GW,Huang, WB,Chen, SJ,&Zhang, S.(2018).Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China.Energies,Vol.11 No.4,868. |
MLA | Zhang, XS,et al."Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China".Energies Vol.11 No.4(2018):868. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论