CORC  > 四川大学
Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China
Zhang, XS; Ma, GW; Huang, WB; Chen, SJ; Zhang, S
刊名Energies
2018
卷号Vol.11 No.4页码:868
关键词wind power photovoltaic power hydropower complementary operation scheduling progress optimality algorithm (POA)
ISSN号1996-1073
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/1842488
专题四川大学
作者单位Sichuan Univ, Coll Water Resource & Hydropower, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Sichuan, Peoples R China
推荐引用方式
GB/T 7714
Zhang, XS,Ma, GW,Huang, WB,et al. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China[J]. Energies,2018,Vol.11 No.4:868.
APA Zhang, XS,Ma, GW,Huang, WB,Chen, SJ,&Zhang, S.(2018).Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China.Energies,Vol.11 No.4,868.
MLA Zhang, XS,et al."Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China".Energies Vol.11 No.4(2018):868.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace