CORC  > 四川大学
Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress
Zhang Jian-hai; Wang Ren-kun; Zhou Zhong; Zheng Lu; Zhang Ru; Xie He-ping
刊名ROCK AND SOIL MECHANICS
2018
卷号Vol.39 No.3页码:1002-1008
关键词pre-load factor high geo-stress underground powerhouse anchor cable Jinping-I hydro-power station
ISSN号1000-7598
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/1838134
专题四川大学
作者单位1.Sichuan Univ, Inst Disaster Management & Reconstruct, Chengdu 610065, Sichuan, Peoples R China
2.Sichuan Univ, State Key Lab Hydraul & Mt River & Protect Engn, Chengdu 610065, Sichuan, Peoples R China
3.Sichuan Univ, Coll Water Resources & Hydropower, Chengdu 610065, Sichuan, Peoples R China
4.Chengdu Engn Corp Ltd, PowerChina, Chengdu 610072, Sichuan, Peoples R China
推荐引用方式
GB/T 7714
Zhang Jian-hai,Wang Ren-kun,Zhou Zhong,et al. Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress[J]. ROCK AND SOIL MECHANICS,2018,Vol.39 No.3:1002-1008.
APA Zhang Jian-hai,Wang Ren-kun,Zhou Zhong,Zheng Lu,Zhang Ru,&Xie He-ping.(2018).Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress.ROCK AND SOIL MECHANICS,Vol.39 No.3,1002-1008.
MLA Zhang Jian-hai,et al."Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress".ROCK AND SOIL MECHANICS Vol.39 No.3(2018):1002-1008.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace