Review of long-term settling of high fills | |
Xu Ming ; Song Erxiang | |
2010-10-12 ; 2010-10-12 | |
关键词 | Practical/ airports construction creep railways roads soil wetting/ infrastructure development China high-filled construction highways railways airports wetting coarse soil micromechanism creep settling/ E3030 Construction industry E2180B Plasticity (mechanical engineering) E1630 Testing |
中文摘要 | The booming infrastructure development in western China is leading to more and more high filled construction. The long-term settling of these high fills will influence the highways, railways, and airports built on top fills, but this settling is difficult to predict. This paper investigated a wide range of long-term field monitoring of high fills. The results show that creep settling, which will continue over a long period, is linearly related to the logarithm of the elapsed time. Large collapse settling can occur during wetting after construction. Laboratory testing showed that the settling is related to the micro-mechanisms of the coarse soils. So, it is necessary to carry out long-term monitoring on high fills in China and micro-mechanisms research. |
语种 | 中文 |
出版者 | Tsinghua University Press ; China |
内容类型 | 期刊论文 |
源URL | [http://hdl.handle.net/123456789/82065] ![]() |
专题 | 清华大学 |
推荐引用方式 GB/T 7714 | Xu Ming,Song Erxiang. Review of long-term settling of high fills[J],2010, 2010. |
APA | Xu Ming,&Song Erxiang.(2010).Review of long-term settling of high fills.. |
MLA | Xu Ming,et al."Review of long-term settling of high fills".(2010). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论